From Collapse to Hope: Mucha Bridge on Kisoro - Bukimbiri Road Finally Being Repaired
| www.abunvavianney.com
On 9th October 2026, Mucha Bridge collapsed.
A blue truck loaded with sacks, struggling to cross, went down with the bridge as residents watched in shock. The bridge broke under load, leaving the truck stuck and the road completely cut off.
In one moment, Kisoro was cut off from Bukimbiri, Rubuguri and Nkuringo. No vehicle could pass. No boda, no taxi, no lorry carrying food and goods.
For more than one month, our people have suffered. Mothers crossed the river on foot carrying children. Farmers carried their produce on heads. Traders lost money. Patients struggled to reach Kisoro Hospital. Students going to school had to wade through water.
People were forced to use long alternative routes via Nyakabande and Kanungu - expensive, far and dangerous.
NOW, HOPE HAS RETURNED.
The Ministry of Works and Transport has now moved in with heavy machines. A Komatsu excavator is on site. Two big metallic barrels have already been laid, and chainage works are done.
On Monday, 16th November 2026, residents gathered at Mucha to witness the progress with their own eyes. The road is being shaped again. The bridge is coming back.
We thank the Ministry of Works and Transport for responding to the cries of the people of Kisoro.
Abunva Vianney Media will keep following this story until the road is fully open and vehicles are moving again.
Are you from Bukimbiri, Rubuguri or Nkuringo? How did this collapse affect you? Tell us in the comments.
Follow Abunva Vianney Media for more Kisoro updates.
Website: abunvavianney.com



Comments
Post a Comment